KCL Cabinets — Master Estimator




KCL
Custom Cabinets & Millwork
New Estimate
Estimate Total
$0.00






📄 Client & Project









🔧 Scope & Specifications












📷 Project Photos
{e.preventDefault();this.classList.add(‘over’)}”
ondragleave=”e=>{this.classList.remove(‘over’)}”
ondrop=”dropPhotos(event)”>

📷
Click to upload or drag photos here
Before / After / Site / Reference — any image

■ Cabinet Schedule — Mozaik V12 Frameless




# Mode Cabinet Type W” H” D” Qty Door Style $/sqft Box Doors HW Line Total


0Cabinets
0Box Sq Ft
0Door Sq Ft
$0Cabinet Total

◻ Door & Drawer Front Schedule — Reface Only (Exact Sizes)

Enter the exact measured size of each existing door or drawer front. Use fractions for precision — e.g. 12 15/16 × 28 3/4.

# Type Width (W) Height (H) Qty Door Style Sq Ft Hinges Unit $ Line Total


0Pieces
0Doors
0Drawer Fronts
0.00Total Sq Ft
$0Reface Total

🌞 Door Style — Select for Entire Project

Choose the door profile applied to all cabinets. Rate applies to door face sqft only.

🎨 Paint & Stain Finish




Paint Colors
Stain Colors


Check when client requires color matching to an existing finish, special order paint, or brand-specific formula.

Custom Color & Stain Selections







🔨 Trim & Molding

Item Unit Qty / LF Rate Total
Crown Molding Lin. Ft $0.00
Light Rail Lin. Ft $0.00
Base Molding Lin. Ft $0.00
Toe Kick (Applied) Lin. Ft $0.00
Filler Panels Sq Ft $0.00
Scribe Molding Lin. Ft $0.00
Valance Each $0.00

✚ Upgrades & Accessories

Item Unit Qty Rate Total
Lazy Susan (Corner) Each $0.00
Pull-Out Shelf Each $0.00
Soft-Close Upgrade Per Door $0.00
Glass Shelves Each $0.00
Under-Cabinet Lighting Lin. Ft $0.00
Delivery & Setup Flat $0.00
Installation Labor Hours $0.00
Demo / Remove Old Cabs Hours $0.00
Site Preparation Hours $0.00

+ Custom Line Items

Description Unit Qty Rate Total



💰 Pricing & Markup
Contractor Tier







📈 Cost Breakdown
Cabinets — Box Material$0.00
Doors & Drawer Fronts$0.00
Hardware (Blum)$0.00
Finishing (incl. custom match)$0.00
Trim & Molding$0.00
Extras & Labor$0.00
Custom Items$0.00
Door & Drawer Reface$0.00
Subtotal$0.00
Wood Species Adj.—
Markup / Overhead$0.00
After Tier Adjustment$0.00
Tax$0.00
Deposit Required$0.00
Project Total
$0.00
🖨 Proposal Actions